Colocation guides
Prepare your hardware, power allocation, network handoff and on-site maintenance requests.
- Articles
- 5
- Focus
- Practical guidance
Plan the physical move as carefully as the application deployment. Confirm compatibility, receiving instructions and remote recovery before sending equipment, then document the final installation.
Start here
Planning
- Colocation vs Dedicated Hosting: Who Owns and Maintains the Server?Compare hardware ownership, replacement responsibility and the work involved in moving a physical machine.2 min read
- Planning Colocation Power: Amps, Volts, Watts and HeadroomUse measured input power and the agreed service limit rather than a power-supply label alone.2 min read